Mayfield Gates
Residential

Driveway Gates.
Drawn, welded and fitted by us.

Every driveway is different. The gradient of the drive, the posts, the power, the way you use the house. We design the gate around all of it, build it to your exact specifications, and install it properly so it works every single day for the next fifteen years.

Typical lead time

6, 10 weeks

Finish

Hot-dip galvanised, powder coated

Safety standard

Risk assessed to BS EN 12453

Automation warranty

2 years

Recent work

Driveway Gates we have built

A few from the workshop and out on site. Every one designed, sourced and installed by our own team.

Black metal bow-top double swing gates photographed at dusk
Hardwood slatted curved-top double swing gates
Black contemporary double swing gates with LED lighting at night
Black timber double swing driveway gates hung between brick pillars
01 / 04

Designed around your home, not an off-the-shelf catalogue

Most companies selling driveway gates have a catalogue of ten shapes and pick whichever one fits closest. We start with a survey and a drawing. Your property, your opening width, your gradient, the way the gates will sit against railings or walls, the material that matches the house. The design comes from that, not from a template.

You get a CAD drawing to sign off before any steel is cut. Finish, frame profile, infill, cap detail, colour, fixings, the lot. Once you are happy with the drawing, that is what gets built.

Side view of black metal estate gates over block paving
Side view of black metal estate gates over block paving
02 / 04

Hardwood, steel, aluminium, or a combination

Mild steel is still the workhorse for driveway gates. Heavy-gauge frames, hot-dip galvanised, powder coated in any RAL colour. It is what most modern homes want: clean lines, flat bar or box section, minimal ornament.

For warmth and a traditional look, hardwood is hard to beat: iroko, sapele and utile, either as a solid gate or clad onto a steel frame. Aluminium suits contemporary homes that want a crisp, low-maintenance finish that never needs painting. And timber or composite cladding gives you the grain of wood over a frame that does the structural work.

  • Swing and sliding gate configurations for any opening
  • Heavy-gauge mild steel, galvanised and powder coated
  • Powder-coated aluminium for a low-maintenance finish
  • Hardwood gates and iroko, sapele or utile cladding on steel frames
  • Matching railings, side panels and pedestrian gates
  • Stainless hinges, bearings and fixings as standard
Black contemporary double swing driveway gates in daylight
Black contemporary double swing driveway gates in daylight
03 / 04

Automation that just works

A gate that sticks halfway open in the rain stops being a feature and starts being a headache. We install underground or above-ground motors from Roger Technology and SEA, specified for the actual weight and cycle count of your gate, not whatever is cheapest that week.

Every installation is risk assessed and tested within the guidance of BS EN 12453 before we leave. Safety edges where the design needs them, photocells on the sweep path, manual release in case of power loss, and an intercom or app control if you want to open the gate from inside the house or from your phone.

  • Underground, above-ground and articulated arm motors
  • Sliding motors for long openings
  • Keypads, fob readers, GSM and video intercoms
  • App control over WiFi or 4G for remote openings
  • Battery backup and solar options where mains is awkward
White picket gate with an intercom mounted on the post
White picket gate with an intercom mounted on the post
04 / 04

Installed once, properly

Driveway gates live in concrete. The posts have to go in right the first time, plumb, deep, braced, and tied into the existing wall or pillars correctly. If the groundwork is wrong, every problem with the gates for the next decade will come back to that week.

We dig out, set posts in concrete, run the power and low-voltage cabling in ducting, pour the slabs for motor housings, and hang the gates on stainless bearings. Commissioning includes a full risk assessment, a manual release demo, and a walk-through of the handover pack with you before we leave site.

Groundwork and cabling being run during a driveway gate installation
Groundwork and cabling being run during a driveway gate installation

Book a driveway survey

Tell us a bit about the property and we will arrange a free on-site survey, usually within a week or two. No pressure, no obligation, no salesman in a suit.

CallBook a survey